We deliver zero-carbon mining solutions and invest in mining projects at home and abroad. We believe mining's green transition should not be a passive environmental cost — it should be an active choice to rebuild efficiency, profit and competitiveness.
Shengtai has worked in new energy for years, building full project development and operating capability across PV, charging infrastructure and storage. We extend that into mining, integrating equipment, energy, intelligence and finance into one deliverable engineering system around the goal of a zero-carbon mine. We participate as investors: not simply selling equipment into a mine, but sharing project investment, running operations and sharing long-term returns. Our team stays engaged across the whole project cycle — from feasibility study through steady-state operations.
Talk to us
Green mining productivityFor every mine to become a model of green productivity, and for Chinese zero-carbon mining solutions to become the default choice in resource nations worldwide.
Through reliable technology, trusted partners and implementable solutions, convert China's accumulated capabilities in new energy and advanced manufacturing into lasting operating advantage for our clients.
Getting people out of hazardous roles is the first priority for every investment we make.
No concept packaging — every solution judged against verifiable operating data.
Creating value with clients, partners and host communities rather than extracting it.
One delivery is the start; continuous iteration is our commitment.
From new-energy investment to zero-carbon mining solutions, we have tested the limits and reach of our capabilities through real projects.
Through Hubei Shengtai New Energy Investment Co., Ltd., we developed deep expertise in PV project development and operation and charging network planning, establishing core project investment and engineering management capability.
We extended new-energy capability from PV into heavy-truck charging and swapping, evaluating and advancing large charging infrastructure projects such as the Yangtze River high-power charging station, building operating experience in fleet electrification.
We defined a three-tier structure — Hubei Shengtai → Hong Kong/Singapore holding → country project companies — preparing the organisation for markets including Indonesia, Laos and Zimbabwe.
Integrating electric equipment, zero-carbon energy, AI autonomy and supply-chain finance into a complete solution and project investment capability for mines at home and abroad.
From a single machine to a full zero-carbon retrofit, we take on the complete works — equipment supply, infrastructure and system commissioning — avoiding blurred accountability across multiple vendors.
Rather than building a closed single-technology ecosystem, we integrate the most mature vehicle, energy and algorithmic solutions, preserving client choice and flexibility to switch.
We share project risk as investors and share returns as operators — aligned with clients over the long term rather than exiting after a single transaction.
Shengtai participates as both investor and solution integrator. We do not run our own vehicle production lines. Instead we integrate mature capabilities from established new-energy machinery, autonomy and supply-chain providers, delivering a package not tied to a single supplier, while participating in project investment and long-term operations.
Heavy uphill is the hardest development case for electric haul trucks, since hauling ore from depth to surface consumes enormous power. The industry now addresses this with high-capacity packs (up to 700 kWh), by-wire chassis and energy recovery, with five years of operating data confirming 88% capacity retention. For the most extreme cases, a range-extender powertrain is available as a complement.
Yes — and that is precisely what our zero-carbon charging network addresses. By combining PV, storage and green ammonia or methanol generation into a grid-forming microgrid, a mine can operate entirely off-grid. Batteries also support charge-as-you-work, and in some duties such as heavy downhill, energy recovery further reduces net consumption.
Capital cost depends heavily on site conditions and scope. It ranges from a single fleet replacement (on the order of RMB 10 million) to a full mine retrofit (tens of millions). Shengtai typically works around 30% equity with 70% debt, with specific structures determined after site survey and duty diagnosis. Contact us for a tailored estimate.
Shengtai isolates risk and manages local compliance through a three-tier structure: Hubei Shengtai as sponsor coordinating strategy and capital, Hong Kong and Singapore entities managing offshore financing, trade settlement and investment, and country project companies delivering development, construction and operations. We also work with engineering contractors that bring local integration capability, forming a sound delivery mechanism.
Whether you are a mine operator, an OEM or a financial institution, we prefer to begin with an honest conversation.